Shell begins production at solar-powered Rosmari-Marjoram gas fields in Malaysia

Views
Shell logo

Shell logo


 

Shell has started production from the Rosmari and Marjoram gas fields offshore Sarawak, Malaysia, in a development powered by solar energy and designed to supply gas into the 2030s.

Sarawak Shell Berhad (SSB), a subsidiary of Shell plc, announced the first gas from the fields, located 220 kilometres off the coast of Sarawak.

In a statement on Tuesday, Shell said gas produced from Rosmari-Marjoram will be piped to a new onshore gas plant in Bintulu, Sarawak, where it will be processed and fed to the PETRONAS LNG Complex.

“Shell is proud of its long and successful history in Malaysia. We have strong expertise in this basin, and the start-up of Rosmari-Marjoram contributes to production growth into the 2030s. This project builds on decades of experience to bring new gas supply online efficiently and competitively,” Peter Costello, President, Upstream, said.

Rosmari-Marjoram’s offshore platform, according to Shell, is powered by solar panels, with back-up diesel generators available when needed.

It said the onshore plant draws on the predominantly hydropower-based local electricity grid, supplemented by renewable energy certificates to achieve 100 per cent renewable power.

Shell drilled Malaysia’s first oil well in 1910 and has been producing gas offshore since 1982. In addition to Rosmari-Marjoram, Shell said it has interests in a number of producing fields off the coast of Sarawak, including Timi and Gorek, and is exploring other potential opportunities in the basin.

Shell said the project reflects the strength of its partnership with PETRONAS, through Malaysia Petroleum Management and PETRONAS Carigali Sdn. Bhd., bringing together expertise and investment to deliver long-term value.

The fields

Rosmari and Marjoram are deep-water gas fields discovered in 2014. They lie at water depths of around 800 metres. The gas is sour because it contains hydrogen sulphide, which is safely removed at the onshore gas plant.

ALSO READ: Shell to sell stake in Australia’s North West Shelf for $1.45bn

In September 2022, Shell took a final investment decision on the project.

According to Shell, the Rosmari-Marjoram development consists of a subsea tie-back, an unmanned wellhead platform, a 207-kilometre pipeline to shore, and an onshore gas plant at Bintulu.

It explained that SSB is the operator of Rosmari-Marjoram, holding 71 per cent equity. The other partners are PETRONAS Carigali Sdn. Bhd., INPEX Malaysia E&P 2E Sdn. Bhd., and SEARAH (Malaysia) Sdn. Bhd. (formerly known as Seara Energy Sdn. Bhd.)

Comments are disabled